    OXYDIA, oxidized metals

    Decorative effect taht gives the surfaces the tactile and visual aspect typical of oxydized metals.

    Acrylic Finishes

OXYDIA, oxidized metals

Inspired by the corrosive force of time on matter, the decorative effect that allows the tactile and visual aspect typical of oxidized metals to be reproduced on surfaces. Thanks to the clever combination of colors, the walls come alive with metallic flashes and shades of color, giving life to creations rich in personality and character.

OXYDIA Fusion – OXYDIA Colata - OXYDIA Sand – OXYDIA Lamina: four effects that differ from each other for the materiality of the texture.

OXYDIA products
CeboFix R: white acrylic primer with quartz, breathable for interiors and exteriors
CeboStone: white acrylic base and finish, with a sandblasted effect, for interiors and exteriors
CeboIron Cromo: metallic finish for interiors and exteriors
CeboIron Grigio e Nero: semi-covering finish with a micaceous effect for interiors and exteriors

Preparation of surfaces
Check that the supports are uniform, perfectly clean and dry. In the presence of recent skimming, powdery or absorbent surfaces, thoroughly clean the substrate and apply the CeboFix M insulating fixative in one coat, with a brush, diluted 1:1 with water.

Application cycle of OXYDIA Fusion
CeboFix R and CeboStone: on the prepared substrate, apply a coat of CeboFix R with a roller. Then apply a coat of CeboStone in shade 254/2 with the Cebos plasterboard (3x7 or 3x10) in crossed brush strokes for approximately 1 m2; dab the surface with the wooden pad (13x13), so as to create a delicate design with light movements and continue working.
1st and 2nd CeboIron colour: on dry CeboStone, apply the first CeboIron shade with the plasterboard in crossed brush strokes over the entire surface. After 4-6 hours, apply the second shade of CeboIron with a synthetic sponge and work the surface so as to glimpse the first shade of CeboIron.

Application cycle of OXYDIA Colata
CeboFix R and CeboStone: on the prepared surface, apply a coat of CeboFix R with a roller. Then apply a coat of CeboStone in shade 254/2 with the Cebos trowel in vertical brush strokes for strips of approximately 1 meter; then dip the pointed part of the Smartflex trowel in CeboStone and pass it, vertically and irregularly, over the treated surface, so as to create a design with more grainy areas alternating with more compact ones.
1st and 2nd CeboIron colour of CeboIron: on dry CeboStone, apply the first shade of CeboIron with the trowel, following the vertical direction of the work. After 4-6 hours, apply the second shade of CeboIron vertically with a synthetic sponge and work the surface so as to glimpse the first shade of CeboIron.

Application cycle of OXYDIA Sand
CeboFix R and CeboStone: on the prepared surface, apply a coat of CeboFix R with a roller. Then apply a coat of CeboStone in shade 254/2, with the Cebos plasterboard in vertical brush strokes for strips of approximately 1 meter; go over the treated surface using the plasterboard on the edge and then pass the Smartflex stainless steel trowel flat, so as to highlight the design.
1st and 2nd CeboIron colour of CeboIron: on dry CeboStone, apply the first shade of CeboIron with the plasterboard, following the vertical direction of the work. After 4-6 hours, apply the second shade of CeboIron vertically with a synthetic sponge and work the surface so as to glimpse the first shade of CeboIron.

Application cycle of OXYDIA Lamina
CeboFix R: on the prepared substrate, apply CeboFix R in shade 254/2 and diluted 20-30% with water, with a roller in one or two coats, until the surface is completely covered.
1st and 2nd CeboIron colour of CeboIron: on dry CeboFix R, apply the first shade of CeboIron with the small ceiling brush, in a vertical direction and then blend the entire surface with the Smartflex trowel. After 4-6 hours, in strips of approximately 1 meter, draw, always with the first shade of CeboIron, vertical stripes in an irregular manner, leaving empty spaces; the stripes, while the product is still wet, must be flattened with the Smartflex trowel. In the same way, with the second shade of CeboIron, the empty spaces must be worked. When applying the second coat of paint, it is advisable to keep the first coat at hand in order to correct any mistakes made.

  • If more than one pack has to be produced in the same color, it is advisable to use bases and colorants carrying the same batch number.

    CEBOFIX R CEBOKIT 254/2
    12 L 120 ML
    5 L 50 ML
    2,5 L 25 ML
    1 L 10 ML

    CEBOSTONE CEBOKIT 254/2
    10 L 100 ML
    5 L 50 ML
    1 L 10 ML

    CEBOIRON Cromo, Nero, Grigio CEBOKIT /1 /2
    2,5 L 25 ML 50 ML
    1 L 10 ML 20 ML